Please be advised that between May 17th and May 24th, there will be a generator on the roof of the pool area and level 4 on Homer St. and Drake St. to assist with cutting the beams supporting the scaffolding. These beams need to be removed so the remaining scaffolding can be dismantled.

Your anticipated cooperation is appreciated.