Dear Owners and Residents:
Please be advised that in preparation of painting, a contractor will be pressure washing the main metal roof along with the lane wall (up to Level 3) and the street level walls along Drake Street starting on:
Monday May 9, 2022
This pressure washing is expected to last two days.
Your anticipated cooperation is appreciated.